Chinese flag
Chinese page
German flag
Login to Support
 
 
 
 
 
 
 
Eyelit Classic Solutions™ | Operator Station

VERSION 3.0 HIGHLIGHTS

We are excited to announce the release of Operator Station, version 3.0, which has significant new features and enhancements. This document describes all new features, enhancements and bug fixes included in Operator Station 3.0, which will be new to customers previously using Operator Station 2.5. Please note that some of these enhancements were made available in service packs prior to the release of Operator Station 3.0.

Significant highlights include:
  • Java Web Start deployment kit
  • Lot alias functionality
  • Highlighting of similar lots, for batching
  • Ability to filter lot lists into subsearch list
  • Automatic merge at track-in
  • New tab for lot comment history
  • Ability to add/remove lot parameters at current step
  • Ability to change lot priority
  • Numerous keyboard and bar-code enhancements
  • Enhanced toolbar and workbar area, which is easier to customize
  • Many new properties for increased flexibility
  • New style file for 640x480 resolution screens
  • Support for PROMIS 5.6 features, such as component-level parameters
  • Enhanced Find function
NEW FEATURES AND ENHANCEMENTS

The following features are included in this release of version 3.0. Some are completely new in this release, and some became available in service packs subsequent to the last major release of Operator Station (2.5).
Java Web Start Kit

This version of Operator Station includes a Java Web Start deployment kit, a software deployment technology that allows you to "pull" a client application from an HTTP server onto a targeted machine. There is a detailed white paper on this topic included on the CD.

New Lot Comments Tab
A new tab, labeled Cmt, has been added for lots. For any lot, this tab shows all comments that have been entered in the lot's history. To view the full text in a tooltip for a comment, hover your mouse over the comment.

Lot Alias Function
You can now find and track in lots by alias id. When this is enabled, you can enter or scan an alias id into the Lot or Item field (instead of a lot id) and Operator Station will highlight all lots in the list that use that alias. You can also switch back and forth between using Lot Ids and Alias Ids, simply by using a toggle checkbox that will appear beside the Lot/Item field.

Support for PROMIS 5.6
This version of Operator Station supports PROMIS 5.6. Changes have been made to be compatible with PROMIS TP changes.

New Style File for 640x480 Resolution Screens
This release includes a new look and feel for clients who want to run Operator Station in 640x480 resolution. This allows devices with limited screens to be able to effectively run Operator Station.

Component-Level Parameters
This version supports the new component-level parameters introduced in PROMIS 5.6. If you are using PROMIS 5.6, Operator Station supports the ability to add, update, or delete component-level parameters at the current step. Once enabled, you can drill down on any component listed on the lot Cont tab, to see the new component-level Param tab. On this tab, you can add, update, or delete parameters.

Component-Level Tracking
This version supports the new component-level tracking introduced in PROMIS 5.6. If you are using PROMIS 5.6, Operator Station supports the ability to record Process Job Id and State, cluster PPId and chamber PPId, and component location information. Once enabled, you can drill down on any component listed on the lot "Cont" tab, to see the new component-level Tracking tab.

Java Platform 2, v. 1.3.1
This version uses the latest JRE available (v. 1.3.1).
Enhanced Toolbar, Workbar and Outarea
The internal structure of the toolbar, workbar and outarea has been enhanced, to make it easier to customize these buttons in your Local_Client.properties file. For more details on how to customize toolbar and workbar buttons, please refer to the updated System Configuration & Management Guide, included on the CD.


Ability to Filter Lot Lists into a Sub-search List
For any of the lot lists, you have the option of being able to do sub-searches. For example, if you have a long list of waiting lots, you could enter TP2 in the Item field to narrow the list down to only those lots that start with the characters TP2. To return the display to show all waiting lots, clear the Item field and click Enter.

Leverage Scheduling
This version of OS can be integrated with Leverage Scheduling.

Enhanced Lot Summ Tab
The lot summary tab has been redesigned into subtabs (Info, Yields and Comments), for easier readability of information. Additional fields have also been added, such as stock position, lot priority, and the current production area and location of the lot.

Change Lot Priority
OS now supports the ability to change lot priority. This feature is available on the newly redesigned Lot Summary tab.

Operation Header
When viewing an operation (for example, when doing data collection), the header can now show the lot id.

Track-In Confirmation
A new property allows you to disable the track-in confirmation prompt.

Prior Step Return
A new property lets you prevent the return of starting raw material.

Cont Tab Enhanced
The lot's Total Lot SubQty is now displayed on the lot Cont tab.

Also added a property that allows separate splits for unidentified lots (so user can enter different quantities for splitting, and then click Done to split into separate lots).


EqpUnit Summary:Status Field
The combo box of status codes on the EqpUnit Summary tab box has been enhanced to show the description beside each status code.

You can also customize (by a client property) your preference for displaying the code (default) or the full description in the Status field. However, long descriptions may be truncated if you turn on this property.


Highlight Similar Lots for Batching
You can enable automatic highlighting of all lots, which have similar characteristics, in the waiting lots list.

Automatic Merge at Track-In
This release includes an enhancement to handle the automatic merging of sub-lots after a temporary split. If a lot was temporarily split and scheduled to merge at a future time, the sub-lots will be automatically merged at the appropriate track-in, provided that all applicable sub-lots are at the same location.

When you try to track in a lot that is scheduled for a merge:
  • If the parent lot and child lot(s) are all present at this location, they will be automatically merged at track-in.

  • If one or more of the lots to be merged are not present at this location, a message will inform you that the lot cannot be tracked in. The message will list the lots that are missing at this location.
Filtration of Equipment Unit Failure Codes
On the equipment Summary tab, the combo boxes for equipment Failure Codes are now filtered to show only the failure codes that are valid for the current equipment unit.

Toolbar and Workbar Font Sizes
The font size for toolbar and workbar button labels has been externalized.

Find Button
The Find dialog box has been enhanced. The OK button now does the same as double-clicking on a highlighted lot: it navigates to that lot. The Cancel button just closes the dialog box. Also, if you press Back after navigating to a lot's location using Find, you will move up one level to the list of locations for that production area. The list of lots in the Find dialog box now shows the lot's production area as well as location.

Lot Split
You can now prevent an immediate lot split, if it will result in all of the lot's main quantity being split off.

Add/Delete Lot Parameters at Current Step
On the lot Prm tab, two new buttons have been added, allowing you to add or delete a lot parameter at the current step.

Fast Login Feature
You now have the option of changing the way that the Operator Station client is launched. By default, you are prompted for username and password before the client is launched. However, if you turn on the FastLogin feature, the client launches first, and then you are prompted for username and password. This allows you to launch the client, even when the proxy has been shut down for maintenance or when PROMIS is unavailable, and provides better feedback on communications issues.

DCOp
Added support for editing of component Ids for 2Dcomp when the lot is non-identified.

Enhanced EqpUnit Capabilities tab
A new property that allows you to disable editing of the check box on the capabilities tab.

Lot SubQty
Each lot's current sub-quantity is now displayed in the waiting and running lot lists, and in the status bar.

Enhanced Keyboard/Bar-code Support
Additional meta keys have been added to the interface, such as on the Login dialog, Find dialog, and for Relogin (Alt + Z).

EqpType Displayed on Track-Out
When a lot is tracked out, Operator Station now shows the EqpType (or capability, if using AdvEqp) as well as the Location to which the lot is being moved.

Dispatch List Supports PROMIS FFS
The Dispatch list now shows two additional columns, Critical Ratio and Priority.

Enhanced Flexibility for Equipment Failure Codes Display
If you use Advanced Equipment, by default the EqpUnit Summary tab shows Failure Code descriptions in the combo box.

Optional Reminder Messages for Material Consumption and Rework.
On track-in, you can have a message pop up to remind users that material consumption will be required at this step. This message is disabled by default.

On track-out, you can have a message pop up to advise users that rework is allowed at this step, and to ask if they want to rework any components at this time. This message is disabled by default.


Rework Counter
In the top right corner of the lot header, there is a new indicator that shows the current rework cycle number, and the maximum allowed. This information is read directly from PROMIS. It is shown as "rework cycle count / maximum rework cycle count" (example, 2/9).

Ability to Disable Rework Combo Box When Rework Is Not An Option.
If rework is not an option at the current step, the Rework combo box on the lot Cont tab can be automatically disabled.

Obsolete Reject or Rework Codes
By default, Operator Station no longer displays any reject codes that are marked as obsolete in PROMIS. You have the option of changing this so that obsolete codes are still displayed.
 
 
↑ Top of page
 
 
"Eyelit is one of a new breed of production management suppliers that "gets it" when it comes to plant software. This is what manufacturers need in order to enhance enterprise performance in real time."