Case Study

Case Study – Leading Med Dev Mfg Implements Advanced Plant Scheduling to Unlock SC Value

Case Study – Leading Med Dev Mfg Implements Advanced Plant Scheduling to Unlock SC Value
Medical DeviceAdvanced Planning and Scheduling (APS)Agent EyeQSales Inventory and Operations Planning (SIOP)

A leading global maker of medical devices had an ERP in place but did not have a formal plant planning and scheduling system to optimize detailed production workorders across a key plant. The planners relied on spreadsheets in a disjointed way to try to plan through and across plants. Without an intelligent planning and scheduling system, value was being lost each day with the lack of optimization.

AE
AuthorDr. Ashok ErramilliGeneral Manager at Eyelit Technologies
← Back to Case Studies