Every factory has a constraint: the one resource that sets output for everything else. Keep it running on the right work, and the whole plant produces more. Let it starve or stall on setups, and no amount of effort upstream makes up the difference.
The hard part is that the constraint doesn't stay in one place. Agent EyeQ finds today's real bottleneck, re-sequences its dispatch list and paces upstream releases to match, whenever WIP, tool states or shifts change.
Why the bottleneck won't sit still
The bottleneck moves with product mix, tool downtime and staffing. The tool that limited output at the start of the week may have spare capacity a few days later, after the mix shifts or another tool goes down.
Most dispatch lists are built once, at the start of a shift, against the constraint someone expected to see. Within hours, that list no longer matches the floor.
“Every hour lost at the constraint is an hour lost for the whole factory.”
What a stale dispatch list costs
When the dispatch list falls behind the floor, the constraint either starves for work or runs costly setups it didn't need. Meanwhile, upstream tools keep releasing WIP the constraint can't absorb, so queues build in front of the wrong equipment. Output falls even while most of the floor looks busy.
The tool that sets output sits idle waiting for the right lot. Lots arrive out of order, forcing changeovers that grouping would avoid. Upstream tools flood queues in front of equipment that can't absorb it.
How Agent EyeQ keeps the constraint fed
Agent EyeQ treats the dispatch list as something to revisit, not something to set and forget. When conditions on the floor change, it runs the same four-step loop.
The loop runs again whenever WIP, tool states or shifts change.
- Detect. A WIP or queue change, a tool going down or a new shift wakes Agent EyeQ. It reads queue depths, tool availability, cycle times and due dates.
- Find. Eyelit APS identifies the active constraint for this shift and this product mix.
- Re-sequence. The constraint's dispatch list is reordered to group setups and honor due dates, and upstream releases are paced to match.
- Publish and learn. The list goes to the floor for the supervisor. Idle time and output are tracked against plan to improve the rules.
One loop across MES and APS
Agent EyeQ works between two systems of record. It reads the live floor from Eyelit MES, uses Eyelit APS to find the constraint and sequence work, and publishes the result where the floor will see it.
- WIP and queue depths
- Tool states
- Shift calendar
- Actual cycle times and output
- Due dates and priorities
- Routings and cycle-time standards
- Constraint identification
- Dispatch sequence and release plan
The value on the floor
The result is more output from the equipment you already have.
- Raise factory output. Keep the constraint fed as it moves, and the whole factory produces more without new equipment.
- Cut setups at the constraint. Smart setup grouping reduces changeovers on the tool that matters most.
- Stop WIP pileups. Release pacing keeps upstream tools from flooding queues the constraint can't absorb.
- Keep supervisors in control. Supervisors have the final say, and every override makes the dispatch rules smarter.
Supervisors stay in charge
Agent EyeQ publishes the dispatch list. Your shift supervisor runs the floor.
- Supervisor override always wins. Any change made on the floor replaces Agent EyeQ's list, and the override and its reason are recorded.
- Rules, not black boxes. Dispatch follows named rules, such as setup grouping, due-date priority and release pacing, that planners can read and adjust.
- Every number has a source. Each queue depth, tool state and due date traces back to Eyelit MES or Eyelit APS. If a system doesn't respond, Agent EyeQ says so and keeps the last published list.
- No silent changes. Adjustments to dispatch rules come out of a weekly review with your production team.
What changes on the next shift
A key tool goes down midshift, and the load moves to a different tool. In a static process, the dispatch list stays as written: the planned constraint runs short of work, and lots pile up where the floor can't use them until someone notices and rebuilds the list by hand.
With Agent EyeQ, the tool state change in Eyelit MES triggers a fresh look. Eyelit APS identifies where the constraint sits now, its dispatch list is re-sequenced and upstream releases are paced to match. The supervisor sees the new list on the floor and decides whether to run it as published.
Want to see it on your floor? Learn more about Agent EyeQ or request a demo to walk through dynamic bottleneck scheduling with an Eyelit expert, using a scenario that matches your product mix.